Product Detail :
|
Protection Works On Substations And Substations Of The National Electricity Company (snel) Against Erosion And Floods In The City And Province Of Kinshasa
|
Tender Detail : |
Invitation for Bids:Protection Works on Substations and Substations of the National Electricity Company (Snel) Against Erosion and Floods in the City and Province of Kinshasa
Lot 1: Rope posts
Lot 2: Other positions
Posted by Kimwenza
Masina undersaturation
Sous-satation de Kinsuka
Makala Post and Substation
Project ID: P171141
Procurement Method: Request for Bids
Submission deadline date/time: apr 28, 2023 15:00
Language of Notice: French
The Bidding Documents in French may be purchased by any interested Bidder by submitting a written request to the address below against a non-refundable payment of two hundred US dollars (200.00 USD). The method of payment will be by cash deposit or bank transfer to the bank account whose details are given below:
Bid Security
Lot 1: Rope posts
Lot 1 Amounts in figures 80 000,00 USD'
Lot 2: Other positions
Posted by Kimwenza
Masina undersaturation
Sous-satation de Kinsuka
Makala Post and Substation
Lot 2 80 000,00 USD
The Government of the Democratic Republic of Congo (hereinafter referred to as the "Borrower") has received a credit and a grant from the World Bank to finance the Multisectoral Development and Urban Resilience Project of the City of Kinshasa (PDMRUK ) / KIN-ELENDA, and intends to use part of this credit and this donation to make payments under the works contract for the protection of SNEL substations and substations against erosion and flooding in the provincial city of Kinshasa . This work is divided into two (2) separate lots as follows: Lot 1: Rope posts Cleaning and unblocking of the main gutter into which the site's internal drainage network flows (150 m) and of the Funa river between the Sendwe and Heavy Duty bridges (2,330 m) Repair of damaged parts of the existing internal and external network of the site Demolition of the rail bridge and construction of footbridges downstream of the confluence with the Yolo River Demolition and enhancement of the Pont Forgeron including the pedestrian bridge Construction of the main earth canals with a rock bottom and the side canals, including the protection of the approaches to the river to limit the waste input from the local population while revegetating the right-of-way over 5 m on either side of the canal Protection of all upstream and downstream bridges against scour. Lot 2: Other positions Posted by Kimwenza Repair of internal drainage networks and cable passage, defective roof tiles Construction of a track on the route of the old access road to the site leading to the Lukaya River: roadway on a slope, concreted (like the existing one) and drained by a longitudinal gutter which joins the outlet by a passage Bused on the road to Lemba Imbu Construction of hydraulic drainage and protection works General earthworks Masina undersaturation Cleaning of the river (1300 m) and the internal drainage network of the substation Cleaning of the existing gutter on boulevard Lumumba 110x130 (length 272 m), clogged, brings water into |