Product Detail :
|
Construction Of The Condominial Sewer Network And Anaerobic Baffle Reactor Treatment Plant In The City Of Malanje
|
Tender Detail : |
Tenders are invited for Construction of the Condominial sewer network and Anaerobic Baffle Reactor Treatment Plant in the city of Malanje
1. Construction of the Condominial sewer network for the catchment area which flows into the total of 8.8Kms in the following areas;
• 3.62 Km in Ritondo neighborhood.
• 5.18 Km in Maxinde/Cafucufuco neighborhood.
1. Construction of household toilets and Condominial network inside the plots (including toilets construction, connection to inspection boxes and branches).
• 9.1 Km (17 Demo, 1,114 new constructions and 706 upgrading of existing toilets) total beneficiaries 1,837 un of plots with 5 m pipe length each) in Ritondo neighborhood; and
• 8.71 Km (24 Demo, 784 new toilets constructions and 934 upgrading of existing toilets) total beneficiaries 1,742 un of plots with 5 m pipe length each) in Maxinde/ Cafucufuco neighborhood.
(Total length of Condominial is 17.9 Kms and total latrines to be constructed and upgraded is 3,579 with inspection boxes.)
1. PVC (or HDPE) DN 315 – 3.195 Km 2. ??PVC (or HDPE) DN 400 – 0.272 Km 3. PVC (or HDPE) DN 500 – 2.928 Km 4. PVC (or HDPE) DN630 – 3.708 Km 5. 233 Inspection Chambers 2. Construction of Anaerobic Baffle Reactor and associated facilities 100m3 upgradeable
1. Construction of interceptors 10.1Km Construction and installation of wastewater pipelines and inspection Chambers
1. The Government of the Republic of Angola has received financing from the World Bank and the French Development Agency (AFD) toward the cost of the Second Water Sector Institutional Development Project (WSIDP 2). and intends to apply part of the proceeds toward payments under the contract for the construction of the Condominial sewer network and Anaerobic Baffle Reactor Treatment Plant in the city of Malanje. This Contract which is subject to this RFB shall be implemented within the context of the Component 5 Piloting of Small-Scale Sanitation Service Delivery in Peri-Urban Areas
The Financial and Contract Management Unit (FCMU-WB/AFD) Ministry of Energy and Water (MINEA) now invites sealed Bids from eligible Bidders for the Construction of the Condominial sewer network and Anaerobic Baffle Reactor Treatment Plant in the city of Malanje – the contract comprising the construction of the following;6. All Bids must be accompanied by a Bank-issued Bid Security of USD 150,000.00 (one hundred fifty thousand) or an equivalent in local currency or any freely convertible currency
|