Product Detail :
|
Planning Of Water Course And Precipitation Water Treatment Plant
|
Tender Detail : |
Contract notice: planning of water course and precipitation water treatment plant
In bergisch gladbach in the district of paffrath in the area of ??schmidt-blegge-, dellbrücker- and kempener strasse, an extensive civil engineering project - 2 engineering structures including structural design and technical equipment - is to be planned. the planning service includes the separation of the mutzbach watercourse from the rainwater channel (length approx. 1,000 m (object 2)) and a rainwater treatment system (object 1) for heavily frequented street areas.Order subject engineering services1. civil engineering works according to §43 hoai 2021, with the services according to annex 12: work phases 1 - 9 for object 1: rainwater treatment plant2. engineering structures according to §43 hoai 2021, with the services according to annex 12: service phases 1 - 9 for object 2: water decoupling - water route3. structural planning according to §51 hoai 2021, with the services according to annex 14: work phases 1 - 6 for object 14. technical equipment according to §55 hoai 2021, with the services according to annex 15: work phases 1 - 9 for object 1 with the special services: - engineering structures according to §43 hoai 2021 annex 12 for object 1 in performance phase 8: - local construction supervision - engineering structures according to §43 hoai 2021 annex 12 for object 2 in performance phase 8: - local construction supervision - structural planning according to §51 hoai 2021 annex 14 for object 1 in performance phase 8:- reinforcement reduction- techn. equipment according to §55 hoai 2021 appendix 15 for object 1 in service phase 8: - preparation of documentation [operating instructions, explosion protection document, inventory and maintenance plan] - checking and evaluating addenda (supplement management) - coordination with suppliers regarding the relocation of supply lines of the client intends to commission the service phases (lph) in stages. phases 1 and 2 are to be commissioned directly. the other work phases are to be commissioned step by step, without there being a legal entitlement to this, first phases 3 - 4, then work phases 5 - 7 and 8 - 9.
|