Product Detail :
|
Provision For Refurbishment And Expansion Of The Bsz For Economy _prof.dr.showner
|
Tender Detail : |
Contract notice: Refurbishment and expansion of the bsz for economy _prof.dr.showner
Lot 91: outdoor facilities 2nd ba (old building)Services to be carried out in outdoor facilities: - earthworks (1,100 m³ of soil loosening and disposal for path cases and vegetation areas, 110 m³ of soil replacement) - disposal of soil laga z1.1, z1.2, z2, >z2 (2,880 t) - demolition of construction road (800 m³) - Paving work, concrete slabs/paving, unbound construction (1,600 m²) - granite crust slabs (340 m²) - installation of frost protection and base layers (700 m³) - installation of supporting walls (140 m) and walls (10 m) - installation of borders - concrete - shelves (300 m), steel edge (170 m) - drainage facilities (135 m box gutters) - ditches for utility ditches (110 m³) - equipment elements (27 bicycle parkers, 9 stool benches, 40 m bar fence, 40 m fall protection, 1 tool shed, 3 sports equipment) - Tree plantings including tree discs (24 pcs.) + planting areas (670 m²) - total area for completion and development maintenance to be processed: 2,500 m² sections: first section: retaining wall Lichtgraben west second section: retaining wall Lichtgraben east third section: retaining walls deep courtyard fourth section: retaining walls ramp part 1 fifth section: retaining walls ramp part 2 sixth section: school yard (paved areas + planting work + equipment + demolition of construction road) +++ further contract periods see attachment 1 to fbl. 214, pt. 10.8.++++++ the following documents are to be submitted to the awarding authority on separate request: - product data sheets of named manufacturers - original calculation content of the original calculation: this is to be created at least in accordance with the content of form 223 - breakdown of the unit prices of all positions, d. h.:lv-position; abbreviation; quantity; unit of measure; time approach; Partial costs including supplements in euros per quantity unit (wages, materials, equipment, other); offered unit price (total of wages, materials, equipment, other.+++
|