Product Detail :
|
Proposals for ferreira canal lining project.
|
Tender Detail : |
Edwaleni power station gets water to turn the generator turbines from both the little usutu and the great usutu rivers via two canals; namely the main canal and the ferreira canal. the ferreira canal which takes water from the great usutu river is approximately 4.8 km in length and is an unlined canal. along the course of its route the canal has three aqua-ducts which carry the water across valleys. |